Project · Energy resiliencePRJ-003 / ENERGY · ZONE-W · EN

Energy through
the winter.

Practical solutions for prolonged grid outages — sustainable, simple and inexpensive to maintain.

Light and heat
when the grid is down.

The goal is to preserve essential services during a difficult winter when the central grid may be unavailable for many hours or longer. We start with critical loads — lighting, communications, heating, water, lifts, pumps, medical and work equipment — and favour modular systems that are simple to operate, repair and expand.

01 · APARTMENT OWNER

Apartment autonomy

Keep lighting, communications, charging, refrigeration and, where possible, individual heating operational without unsafe indoor generator use.

  • portable power station or safe battery system;
  • LED lighting and a defined critical-appliance list;
  • shared association solution for pumps, heating point, access and lifts.
Financing: own budget; shared systems through association programmes.Detailed route
02 · ASSOCIATION HEAD

Power for the building

Keep critical apartment-building infrastructure running through a prolonged outage.

  • backup for heating, pumps, water, lighting and communications;
  • solar plus storage, heat pump or generator based on calculations;
  • co-owner resolution, transparent budget and operating responsibility.
Financing: Energy Support, GreenDIM and local programmes.Detailed route
03 · PRIVATE-HOME OWNER

A resilient household

Maintain heating, water, lighting, communications and essential appliances without excessive fuel use.

  • reduce demand and create a critical-load circuit;
  • hybrid inverter, battery and phased solar-panel expansion;
  • generator only as backup for long periods of low generation.
Financing: state programme for household owners.Detailed route
04 · ORGANISATION HEAD

Operational continuity

Preserve critical processes, safety, communications and essential services during winter outages.

  • separate critical equipment from loads that can be switched off;
  • modular backup with a simple maintenance schedule;
  • trained staff, consumable stock and a switching plan.
Financing: business programmes, own funds or donor instruments.Detailed route

Where to look
for financing.

These state-backed instruments serve different applicants. Terms, budgets and application windows may change; always rely on the current programme rules and consultation with the bank or fund.

PRIVATE HOMES

Household energy independence

An active state-supported loan programme for autonomous and backup power in private households.

  • UAH 10,000–480,000
  • up to 10 years
  • compensated rates of 0%, 5% and 7% during years one to three
  • credit approval remains subject to the bank’s assessment
Official programme
HOUSING ASSOCIATIONS

Energy Support

Preferential loans for generators, solar power and heat pumps serving shared apartment-building needs.

  • up to UAH 3 million for up to three years
  • 0% / 5% / 7% depending on term
  • up to 70% compensation for solar or heat pumps
  • up to 50% compensation for a generator
Official programme
GRANT FOR ASSOCIATIONS

GreenDIM

Energy Efficiency Fund grants for generation, storage, heat pumps and generators.

  • up to 70% of eligible solar, storage and heat-pump costs
  • up to 50% of generator costs
  • grant caps depend on equipment and building area
  • applications are made by an ОСББ or housing cooperative
Official programme
BUILDING MODERNISATION

Energy Home

A programme for modernising apartment-building systems and thermal envelopes.

  • Package A covers building systems
  • Package B covers comprehensive thermal modernisation
  • the official page currently states that new applications are suspended
  • check the current status before preparing an application
Official programme

Checked: 3 August 2026 against official pages of Ukraine’s Business Development Fund and Energy Efficiency Fund. This is guidance, not a guarantee of a loan or grant.

From need
to implementation.

STEP-01
01

Initial assessment

Building, consumption, critical systems and target autonomy.

STEP-02
02

Technical concept

Generation, storage, backup, thermal upgrades and priorities.

STEP-03
03

Applicant model

Homeowner, association, cooperative, organisation or another eligible structure.

STEP-04
04

Financing

State, bank and local programmes plus the applicant’s contribution.

STEP-05
05

Project preparation

Co-owner resolution, technical documents, budget, suppliers and application.

STEP-06
06

Implementation

Procurement, installation, commissioning and reimbursement documents.